Camex are a trusted partner for professional excavation, site development and services to construction companies, property developers and councils throughout the Waikato, BOP, Coromandel/Thames, Taupo and South Waikato regions.
We have been involved in some of most significant construction projects recently undertaken in New Zealand from the new BIL Building in Cambridge to the Great Lake Pathways in Taupo.
We have in-house capability for specialised roles, such as surveying, water reticulation and roadmaking, reducing our dependence on sub-contracted trade and providing operational flexibility to ensure the project remains on track.
We have enough crews to undertake multiple activities at once and can successfully navigate project challenges and minimise delays.
Our reputation for “getting in there” and “getting it done” to specification and programme requirements, mean that our customers can plan their construction activities with confidence.
Services Include
Earthworks and site preparation
Building site development and foundation preparation
3 Waters infrastructure, stormwater, sewer and water
Pump stations and process infrastructure
Kerbing
Concrete works including pathways
Landscaping
Retaining walls including Gabion, SED’s, steel post, timber/ concrete crib and MSE type
Streetscape
Street furniture upgrades
Surfacing, chip-sealing and asphalt concreting
Road-marking
Signage
.. I found Camex staff to be polite and courteous and staff are well trained for the tasks they undertook, they also showed a level of professionalism.
Siteworks for 400,000 M2 BIL Building No.1 in Cambridge. Project involved earthworks, 3-waters infrastructure, pavement construction and carpark areas.
Construction of Civil Site works for new development at 86 Alpha Street. Site Clearance and excavation at 1 meter deep. Ground Improvements including sheet piling.
Siteworks for a new Gym. Including 3,000M2 building pad excavated to 1.8m depth, extensive ground improvement to meet category 3 classification. New basketball courts on old gym building site.
Siteworks for 38,000M2 Vizy Board building including removal/ trimming of trees, 13,000M3 cut to waste, importation of sand and preparation of building pad, stormwater drainage, swales and concrete carpark.
Construction of a new car park extension, including earthworks, retaining walls, stormwater system installation, kerb & channel, pavement construction.
Siteworks in tidal ground water conditions including backfill and preparation of building pad, 3-waters , timber/ concrete block retaining walls, carpark construction.
Siteworks for 6,000M2, 5-storey building at the University of Waikato Campus, including 13000m3 of cut to fill, cut to waste 10,000m3. 3- waters, concrete works and kerbing, landscaping, carpark and surfacing.
Construct civil siteworks for a commercial development for the Ebbett Prestidge Vehicle dealership. Three-waters infrastructure including stormwater, catchpits, manholes, Triton stormwater retention system, pedestrian slot drains. sanity sewer.