Address: Ohaupo
Project Status: Complete
Client: Waipā District Council
Project Overview:
The Ohaupo Bridge project centred on the construction of a 4m-diameter arch culvert.
Project Scope:
The project scope encompassed ground improvements, including 47 piles measuring 13m in length and capping beams of 1x1m reinforced concrete with a tie-in to the culvert structure.
Community Benefits:
The project ensures improved water flow and infrastructure durability, reducing the risk of flooding and supporting the overall well-being of the local community.