Hamilton Airport Carpark

Project Status: In progressClient: Hamilton Airport...

July 12, 2023

Mainstream Freight Depot

Project Status: In progressClient: Fosters...

July 12, 2023

Waikato Regional Theatre

Project Status: In progressClient: Fosters...

July 12, 2023

Swayne Road

Project Status: CompletedClient: Cogswell...

July 12, 2023

Memorial Rise Subdivision

Project Status: In progressClient: MG Solutions...

July 12, 2023

Ingram Road Connection

Project Status: In progressClient: Titanium Park Ltd...

July 12, 2023

Cambridge Health Hub

Project Status: In progressClient: AHS Group...

July 12, 2023

Avenue Industrial Park

Avenue Road North, MorrinsvilleProject Status: In progressClient: Avenue Industrial Park Ltd...

July 12, 2023

3MS Subdivision

Cambridge Road, CambridgeProject Status: In progressClient: 3MS...

July 12, 2023

Mokau Streetscape Upgrades & Truck Parking Bay

Project Status: In progressClient: Waitomo District Council...

July 12, 2023

Waitomo Footpath Renewals & Repairs

Project Status: In progressClient: Waitomo District Council...

July 12, 2023

C2-C3 Roundabout

Project Status: In progressClient: Waipā District Council...

July 12, 2023

Waipa & Otorohanga Watermain Renewals

Project Status: In progressClient: Waipā District Council, Ōtorohanga District Council...

July 12, 2023

Stormwater Defenders Taupo

Project Status: CompleteClient: Stormwater Defenders...

June 22, 2023

Watermain and Five Mile Bay Reticulation

Watermain installation of the Tauhara Ridge Water Main along the East Taupō Arterial (ETA) – State Highway 1 (SH1) and installation of town water supply reticulation to Five Mile Bay.Tauhara Ridge new water mains (PE DN180 to DN315PE100) needed to connect to the existing water reticulation in Tauhara Ridge Drive and run along the ETA for about 2.35 km to a new housing development. Our scope included installation of air valves, scour hydrants, and commissioning the falling main and connection ...

June 22, 2023

Arawata Bridge Crossing

Involved pipework crossing of the Arawata Street Bridge in Te Awamutu. Included installation of DN200 CLS pipework, coring through the concrete bridge structure, pipe hangers and seismic restraints, abutment and pier clamp supports, various valves and fittings....

June 21, 2023

Acacia Bay Water Supply

Involved upgrading the Nukuhau pump station and connecting Acacia Bay to the main Taupo water supply. Included a DN355 PE pipeline from Nukuhau to Acacia Bay, upgrades and renewal of rider and water mains DN63 to DN315 through to Tongariro st, air valves, hydrants and fittings. The extended scope included upgrade of the existing shared path and a bridge crossing....

June 21, 2023

Crown Rd Stormwater Diversion

This project involved construction of a stormwater diversion on Crown Road in Taupo. The scope of works comprised earthworks to stabilise escarpment and adjacent retention pond, a new DN560 PE pipe down a steep embankment with seismic restraints and large anchor blocks, installation of DN1800 manhole and various-sized RCRRJ stormwater pipework across Crown Road and connection into the existing network....