Hamilton Airport Carpark
Project Status: In progressClient: Hamilton Airport...
July 12, 2023Mainstream Freight Depot
Project Status: In progressClient: Fosters...
July 12, 2023Waikato Regional Theatre
Project Status: In progressClient: Fosters...
July 12, 2023Swayne Road
Project Status: CompletedClient: Cogswell...
July 12, 2023Memorial Rise Subdivision
Project Status: In progressClient: MG Solutions...
July 12, 2023Ingram Road Connection
Project Status: In progressClient: Titanium Park Ltd...
July 12, 2023Cambridge Health Hub
Project Status: In progressClient: AHS Group...
July 12, 2023Avenue Industrial Park
Avenue Road North, MorrinsvilleProject Status: In progressClient: Avenue Industrial Park Ltd...
July 12, 20233MS Subdivision
Cambridge Road, CambridgeProject Status: In progressClient: 3MS...
July 12, 2023Mokau Streetscape Upgrades & Truck Parking Bay
Project Status: In progressClient: Waitomo District Council...
July 12, 2023Waitomo Footpath Renewals & Repairs
Project Status: In progressClient: Waitomo District Council...
July 12, 2023C2-C3 Roundabout
Project Status: In progressClient: Waipā District Council...
July 12, 2023Waipa & Otorohanga Watermain Renewals
Project Status: In progressClient: Waipā District Council, Ōtorohanga District Council...
July 12, 2023Stormwater Defenders Taupo
Project Status: CompleteClient: Stormwater Defenders...
June 22, 2023Watermain and Five Mile Bay Reticulation
Watermain installation of the Tauhara Ridge Water Main along the East Taupō Arterial (ETA) – State Highway 1 (SH1) and installation of town water supply reticulation to Five Mile Bay.Tauhara Ridge new water mains (PE DN180 to DN315PE100) needed to connect to the existing water reticulation in Tauhara Ridge Drive and run along the ETA for about 2.35 km to a new housing development. Our scope included installation of air valves, scour hydrants, and commissioning the falling main and connection ...
June 22, 2023Arawata Bridge Crossing
Involved pipework crossing of the Arawata Street Bridge in Te Awamutu. Included installation of DN200 CLS pipework, coring through the concrete bridge structure, pipe hangers and seismic restraints, abutment and pier clamp supports, various valves and fittings....
June 21, 2023Acacia Bay Water Supply
Involved upgrading the Nukuhau pump station and connecting Acacia Bay to the main Taupo water supply. Included a DN355 PE pipeline from Nukuhau to Acacia Bay, upgrades and renewal of rider and water mains DN63 to DN315 through to Tongariro st, air valves, hydrants and fittings. The extended scope included upgrade of the existing shared path and a bridge crossing....
June 21, 2023Crown Rd Stormwater Diversion
This project involved construction of a stormwater diversion on Crown Road in Taupo. The scope of works comprised earthworks to stabilise escarpment and adjacent retention pond, a new DN560 PE pipe down a steep embankment with seismic restraints and large anchor blocks, installation of DN1800 manhole and various-sized RCRRJ stormwater pipework across Crown Road and connection into the existing network....
June 21, 2023 Posts 101-118 of 118 | Page prev