Water Treatment plant upgrade at Scott Road Water Treatment plant involved upgrades to the town water supply with installation of new DN180 PE pipeline connection from the town bore water supply to the treatment plant, block chambers, Mag Flow meters, DN250 to DN300 Stainless Steel spools, valving and fittings.
Work was planned in stages as to ensure the town water supply had as little disruption as possible, utilising a combination of new and existing pipework to enable continuous water supply. We worked through the night when a short partial shutdown was required.
Login to your account here to download this Project Profile.
Don't have an account? Register here.