Streetscape project including Cambridge’s first dual cycleway, which will eventually connect to several shared paths and stretch from the Victoria Road roundabout out to the Avantidrome and is part of the Streets for People project which also aims to make the streets of Cambridge more pedestrian and cyclist friendly.
The Cycleway is constructed with dual surfaces of 1510M2 of Concrete and 2040M2 of DG7 Asphalt. Our scope also included drainage assets, kerb, and channel, raised crossings, traffic islands, soft and hard landscaping and street furniture.
Login to your account here to download this Project Profile.
Don't have an account? Register here.