About

This project involves the renewal of over 38,000m of existing drinking water mains around the Waipa and Otorohanga Districts from mid-2022 to mid-2024. The new pipes that will be installed range from 450mm to 25mm in diameter, with various levels of deterioration.

Camex Civil will be using directional drilling technology to carry out trenchless pipeline installation wherever possible.
Progress
85%

Area of Works