Otewa Rd

Water Mains and Renewals
2022-2023

About

This project involves the renewal of over 38,000m of existing drinking water mains around the Waipa and Otorohanga Districts from mid-2022 to mid-2024. The new pipes that will be installed range from 450mm to 25mm in diameter, with various levels of deterioration.

Camex Civil will be using directional drilling technology to carry out trenchless pipeline installation wherever possible.
Progress
85%

Area of Works

Latest Updates

Placeholder Heading

July 26, 2022
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Quisque non finibus magna. Curabitur aliquam sed leo mattis egestas. Etiam hendrerit ullamcorper risus, sed ultricies velit pellentesque et. In quis lorem porttitor, interdum massa non, egestas tortor.
Read More
Read More Updates
Camex Civil - Logo
© Copyright 2022 Camex Limited. All rights reserved.