Otorohanga District

Water Mains and Renewals
2022-2024

Camex Civil - Logo
In
collaboration
with
Camex Civil - News - Logo - WSP
Camex Civil - News - Logo - Waipa District Council
Camex Civil - News - Logo - Otorohanga District Council

About

This project involves the renewal of over 38,000m of existing drinking water mains around the Waipa and Otorohanga Districts from mid-2022 to mid-2024. The new pipes that will be installed range from 450mm to 25mm in diameter, with various levels of deterioration.

Camex Civil will be using directional drilling technology to carry out trenchless pipeline installation wherever possible.
14
Total number sItes
0
Current Active Sites
38387
Total Metres of Pipe
0
Metres of Pipe completed

Timeline

Progress
85%

Area of Works

Camex Civil - Logo
© Copyright 2022 Camex Limited. All rights reserved.